Our Projects

Road Tunnel Work -
Malaysia International Trade Exhibition Centre (MITEC), Kuala Lumpur

A dual-lane road tunnel exit from MITEC carpark complex to Jalan Sultan Haji Ahmad Shah, Dutamas with length of 520 meter.
2014 - 2016
We had been awarded by Daewoo E&C to undertake the RC Work for the exit tunnel from MITEC carpark and all other associated supports structure ie escape shaft, stairs and fan room. The construction of the tunnel was achieved with cut and cover method.

Key Facts



Main Contractor - Daewoo E&C
RC Sub-Contractor - SEAL Consult Sdn Bhd
Method of Construction - Cut and Cover
Total Tunnel length - 520 m
Type of Tunnel - Reinforced Concrete
No of Lanes - 2 lanes
Road surface type - Flat Concrete (Broom finish)