Explore our key expertise works
Basement with Top–Down Construction Method is our Special experience.
TOWER RAFT FOUNDATION
> 4.5-mtr THICK
MEGA-SIZED TOWER COLUMN
> 28m2 / Up to 6m Dia. Circular Column
TALL HEIGHT COLUMN
Experienced up to 29-mtr high Tall Column with sized above 2-mtr width.
TOP-DOWN TOWER CONSTRUCTION
Tower structure with Tower Raft Foundation, in FULL Top-Down construction method.
TOP-DOWN CONSTRUCTION
RC structures (Podium Basement, Watertank, Lift corewall, Column) up to 9-level Depth
BOTTOM-UP CONSTRUCTION
BOTTOM-UP CONSTRUCTION
LOGISTIC WAREHOUSE HUB
LOGISTIC WAREHOUSE HUB
TUNNEL & UNDERGROUND STATION
Open-Cut and Top-Down Construction
TOWER RAFT FOUNDATION
Over 5-mtr thick Tower raft
Background: KLCC (Lot LL1M) Future Supertall Tower Raft Foundation
MEGA-SIZED TOWER COLUMN
> Up to 6m diameter Circular Column
Background: KLCC (Lot LL1M) Future Supertall Tower Mega Column
HIGHRISE CONSTRUCTION
Traditionally, we had involved in number of High-Rise Construction projects using Various SYSTEM FORM (PERI / DOKA / EFCO / VASCO / HUATRACO), ALUMINIUM FORM and Conventional Form.
Background: Merdeka 118 Tower Project
TOP-DOWN CONSTRUCTION
Underground RC structures (basement podium, Tower, WaterTank) with depth up to 9-levels down.
Background: Merdeka 118 Tower Project
LOGISTIC HUB/WAREHOUSE CENTRE
Floor height range from 10m to 14.2m.